Aluminum template, save more than a little

One: Save manpower and material resources ◆The average weight of Antai formwork is 23-27KG/M2, and installation can be achieved by only one worker without complicated forklifts and cranes. ◆Because of its simple operation, novices who pass simple training can install it. The construction period is short, only 4~5 days/layer, which greatly saves time and cost. Two: Save material cost. Aluminum formwork has low carbon and environmental protection...
07-13

How to improve the safety of aluminum formwork construction?

1. The personnel participating in the construction of the formwork project must receive technical training and safety education to make them understand the characteristics of the formwork construction of this project, be familiar with the relevant provisions of the specification and the safety technical operation rules of the post, and pass the assessment before they can start work. The main construction personnel should be relatively fixed.
Previous page
1

Foshan Xingchengfu Group Co., Ltd. (office)
Tel:0757-85213339
Fax:0757-85213336Reception: No. 07, Block A3, Phase II, Fengchi Decoration Materials Market, Dali, Nanhai District, Foshan City
Address: Taiping South Industrial Park, Dali, Nanhai District, Foshan City

二维码

WeChat public account

Copyright ©Foshan Xingchengfu Group Co., Ltd.    粤ICP备16118261号-1  Website construction: www.300.cn

Guestbook

Username used for comment:
客户留言
Description: