One: Save manpower and material resources
◆The average weight of Antai formwork is 23-27KG/M2, which can be installed by only one worker without complicated forklifts and cranes.
◆Due to the feature of simple operation, novices can install it through simple training. The construction period is short, only 4~5 days/layer, which greatly saves time and cost
Two: save material costs
The aluminum template has the natural advantages of being low-carbon and environmentally friendly, and recycling up to 200 times. More importantly, the aluminum can still be recycled 100% after its service life.
The traditional wooden formwork cannot be used again after being used. After being dismantled and stacked on the construction site, it is not only environmentally friendly, but also a lot of expense for the project to clean up.
After the aluminum template is removed, it can be placed in order and can be recycled. The raw materials can be fully recovered, and the company can get a raw material fee
Three: Save follow-up costs
After the aluminum alloy construction template is demolished, the appearance of the concrete is flat and bright, which can basically meet the needs of finishing and water coagulation, without the need for batching, which can save batching costs. And keep the construction site clean, tidy and safe, saving waste disposal costs
After the traditional construction site template is removed, the wall is not flat enough, and it must be criticized again. And it produces a lot of waste, which requires additional cleaning
Time-saving, labor-saving, and money-saving, Antai manufactures, serves, and helps you save.